The World's Best Multiphase Oil & Gas Pumps
About Us
IJACK manufactures artificial lift and optimization equipment for oil and gas production and facility areas.
We proudly help energy companies pump their oil, gas, water, and other fluids in the most reliable, automated, green, and cost-effective manner.
Replace entire separation and compression facilities with one or two patented XFER™ pumps to save millions and green your operations. Imagine the possibilities.
Any Fluid, Any Direction
Oil, gas, water, or any mixture of fluid. Sandy, waxy, hot or cold, customers rely on IJACK to pump their fluids up, sideways, and down, 24-7 with minimal maintenance and intervention.
Extremely Durable
We pride ourselves on building extremely high-quality, durable pumps that operate slowly but powerfully year after year.
Fully Automated
IJACK pumps are fully automated so you can set it and forget it. All our pumps measure, report, and automatically adjust to reach your operators' setpoints. If something goes wrong, IJACK's RCOM™ system will let you know with SMS, email, or phone call alerts (free of charge) so you can take action either remotely or on-site.
XFER™ Multiphase Pump
100% liquid to 100% gas or anything in-between
XFER is a real multiphase fluid transfer pump that lets you pump oil, gas, or anything else your well throws at you.
Eliminate entire separation facilities and save millions
No need to separate the gas from the oil and pump them separately. IJACK customers have saved millions on expensive facilities, simultaneously reducing operating costs while greening their operations.
EGAS™ Compressor
Gas Holding Back Your Oil Production?
EGAS relieves gas back-pressure so you can produce more fluid.
Set it and Forget it
EGAS is fully automated so you can rest easy. Set your desired suction pressure and EGAS will take it there on cruise control.
Liquids Creeping In?
No worries. EGAS will pump the liquids into the flowline.
DGAS™ Beam-Mounted Compressor
Relieve Pressure. Improve Performance.
Compress up to 10 decs/d (350 mcf/d)
Same purpose as EGAS, but it bolts onto your existing conventional pumpjack.
Simple Installation
Secure it to your pumpjack in less than two hours with no welding.
UNO™ Hydraulic Pumpjack
Automatic Production Optimization
- Maintain constant fillage
- Reduce downhole wear
- Automatic pump-off control
- Adapt to changing downhole conditions
- Machine learning surface card alerts
Fast and Easy Installation
Up and running in less than two hours
IJACK Solutions
IJACK has a solution for your production and facility optimization challenges
Challenge | Solutions |
---|---|
Eliminate / reduce emissions, venting and flaring | XFER, EGAS, EGAS-VRU, DGAS |
Lower casing, well and flowline pressures simultaneously to allow more production inflow from the formation | XFER |
Lower pipeline pressures to allow lower pressure wells to access the pipeline and keep pipelines under maximum operating pressure | |
Eliminate hydrates and methanol use by lowering pipeline pressure under the hydrate curve | |
Flowback / Unload thermal wells faster and with less equipment | |
Pump multiphase (oil, water, gas and solids) in emulsion or stratified forms from the wellhead directly to a battery with no additional equipment in-between | |
Reduces liquid loading on free flowing wells and boosts the production to the facility | |
Replace building new satellite or underutilized facilities which are expensive to build, maintain, operate and abandon | |
Pump slurries and solids (e.g. sand and paraffins), in your production stream | |
Avoid pumps cavitating, gas locking or hydro locking | |
Pump/compress emulsions over long distances and mountainous terrain to a facility | |
Optimize artificial lift by extending downhole equipment run life, reducing workover frequencies, lowering stuffing box pressures, reducing PCP torque, increasing plunger lift cycle rates and reducing injection pressures and volumes for gas lift | |
Handle wet casing gas and associated fluids without blow cases or scrubbers | EGAS |
Lower sales gas flowline pressures | |
Lower casing pressure | EGAS, DGAS |
Lower tank top pressures and remove and recover vapor gases and condensates | EGAS-VRU |
Avoid pressure losses in reinjection / water flooding operations and extend injection areas by intensifying pressure | BOOST |
Handle high inlet pressures | |
Avoid acidizing and determine if injection resistance is due to scale build up or formation natural back pressure | |
Avoid building new / expanding current fluid injection facilities | |
Pumpjack with variable stroke speed and length changes with a push of a button – top and bottom stroke delays | UNO |
Fully automated remote controlled pumpjack to optimize production | |
Pumpjack set up in 2 hours with minimal crew | |
The benefits of a hydraulic pump jack and casing gas compressor in one unit | UNOGAS |
Control and monitor equipment from anywhere at anytime | RCOM |
IJACK ADDS A NATURAL GAS ENGINE OPTION
IJACK customers now have the option to run their units using an electric motor or natural gas engine power unit.
CHANGING THE LANDSCAPE
As specialists focused on the development of oil & gas technologies, IJACK is about bringing resources and innovation to the surface. Our goal is simple: to provide producers with advanced products and solutions designed to improve efficiency and increase production – while offering unprecedented control.
We are an engineering company that partners with our customers to create innovative solutions for the most challenging production and midsteam fluid transfer problems.
IJACK's field-proven products are backed by the responsive service and support, throughout the US and Canada, that you depend on to be successful. All so you can gain an edge in an increasingly competitive resource sector.